Grays Harbor County Water District #2 – 2020 Rate Schedule

EFFECTIVE 01/01/2020

RATES

Residential

Single Family $91.00/2 months 1200 ft3 Included $2.15/100 ft3 over 1200 ft3

Multi-Family

1st Unit $91.00/2 months 1200 ft3 Included $2.15/100 ft3 over 1200 ft3

Add Units $69.00/2 months 600 ft3 Included $2.15/100 ft3 over 600 ft3

Commercial $138.00/2 months 1200 ft3 Included $2.15/100 ft3 over 1200 ft3

Multiple Meter/Commercial

Main Meter $138.00/2 months 1200 ft3 Included $2.15/100 ft3 over 1200 ft3

Second Meter $106.00/2 months 1200 ft3 Included $2.15/100 ft3 over 1200 ft3

Public School/WSDOT $428.00/2 months 5000 ft3 Included $2.15/100 ft3 over 5000 ft3

FEES

Late Fee 10% of total outstanding balance

Missing or incorrect account number $ 3.25

Clear debris from meter box $67.00/hr one hour minimum

Returned check $30.00 plus bank fees

CHARGES

General Facilities Charge $3,800/ERU

District will calculate ERU’s for multi-family and commercial developments

Meter/Service Removal $550.00

Meter Installation Charge District Costs

Requires Meter Deposit

Move Meter District’s Discretion No Charge

Move Meter Customer’s Request District Costs

Requires Meter Deposit

Application for Determination of Water Adequacy

Single Family Initial $67.00

Single Family Renewal $34.00

Multi-Family Initial $67.00/hour 1 hour minimum

Multi-Family Renewal (no changes) $34.00

Commercial Initial $67.00/hour 1 hour minimum

Commercial Renewal (no changes) $34.00

Development Initial $67.00/hour 1 hour minimum

Development Renewal (no changes) $34.00

Changes to Applications $67.00/hour 1 hour minimum

Engineering District Costs

Applications that have lapsed more than 60 days will be considered new applications

Service Side Leak Investigation No Charge maximum 1 hour

Developer Extensions District Costs

SEE REVERSE

DEPOSITS

Bill to Tenant $182.00

Meter Installation (no street crossing, not on Highway 12)

5/8” X 3/4” Meter $1,500.00

1” Meter $2,000.00

1-1/2” Meter $2,200.00

2” Meter $2,500.00

Over 2” Meter $3,000.00

Meter Installation Highway 12 $7,200.00 + Meter Deposit

Road Crossing Meter Installation $5,000.00 + Meter Deposit

Highway 12 crossings require a Developer Extension Agreement

Developer Extension Agreement $7,000.00

NOTES TO RATES

  • Water meters are read every other month, so usage over included amounts is based on two months (1,200 ft3).

  • A “billing cycle” is two months. Billing cycles start when bills are generated and end when the next cycle’s bills are generated.

  • The property owner is responsible for all water that passes through the service meter.

NOTE TO FEES

  • Late fees are calculated at the end of each billing cycle.

  • Payments are deemed received based on the office time stamp.

  • Payments are late when received after 3:00 PM on the due date.

NOTES TO CHARGES

  • ERU = Equivalent Residential Unit.

  • Meter/Service Removal is the only way to cease water bills. It involves complete removal of the connection. Should water service be desired for the property at some time in the future, it will be treated like a new service.

  • District Costs” means all costs to the District incurred accomplishing the activity.

  • Applications for Determination of Water Adequacy are valid for one year.

NOTES TO DEPOSITS

  • District costs will be subtracted from deposits.

  • Any remaining money will be refunded to the original applicant.

  • Additional deposit may be required if costs exceed initial deposit.

Grays Harbor County Water District #2 is an equal opportunity provider and employer and does not discriminate on the basis of race, color, national origin, age, disability, sex, gender identity, or religion.